The proposed YEIDA Metro route will connect Ghaziabad, Greater Noida, the Yamuna Expressway region and Noida International Airport in Jewar. The main proposal is a 72.44 km Namo Bharat and Metro corridor that will provide faster regional travel as well as local connectivity to residential and commercial areas.
The route will pass through important locations such as Knowledge Park V, Surajpur, Pari Chowk, Dankaur, YEIDA Sector 18 and Sector 21 before reaching Jewar Airport.
However, the project is still awaiting the required approvals. It is not an operational Metro line.
What is the proposed YEIDA Metro route?
The main proposed corridor is the Ghaziabad to Jewar Namo Bharat and Metro corridor. It will connect Ghaziabad station on the existing DelhiâMeerut Namo Bharat line with Noida International Airport.
The corridor will cover approximately 72.44 km, including around 71.5 km of elevated alignment and 1.29 km of underground section near the airport.
NCRTC plans to operate two services on this corridor. Namo Bharat will provide faster regional connectivity, while Metro services will cover shorter journeys between residential and commercial locations.

Which stations will come under the GhaziabadâJewar Metro route?
NCRTC's proposed plan includes 22 stations, with 11 stations for Namo Bharat services and 18 for Metro services. Seven station locations will be shared by both services. The alignment also keeps provisions for additional stations in future.
Proposed Namo Bharat stations:
Ghaziabad South, Greater Noida Sector 2, Greater Noida Sector 3, Greater Noida Sector 12, Surajpur, Alpha-I, Ecotech-VI, Dankaur, YEIDA North (Sector 18), YEIDA Central (Sector 21) and Noida International Airport.
Proposed Metro stations:
Siddharth Vihar, Greater Noida Sector 16C, Ecotech 12, Greater Noida West Sector 4, Greater Noida Sector 10, Knowledge Park V, Police Lines Surajpur, Ecotech-2, Knowledge Park III, Omega-II, Phi-III, Ecotech-1E, Ecotech VIII, Dadupur, Junedpur, YEIDA Sector 17, YEIDA Sector 15 and YEIDA Sector 33.
The station locations and final alignment may change after project approval.
Which YEIDA sectors will get Metro connectivity?
The proposed corridor will provide public transport access to several sectors along the Yamuna Expressway.
YEIDA location | Proposed service |
|---|---|
Sector 15 | Metro |
Sector 17 | Metro |
Sector 18 | Namo Bharat |
Sector 21 | Namo Bharat |
Sector 33 | Metro |
Sector 18 and Sector 21 are particularly important because they will have proposed Namo Bharat stations. Sector 21 will also benefit from its planned connectivity to the International Film City.
These stations can improve access to residential areas and upcoming commercial developments. However, the actual benefits will depend on the final station locations and feeder transport arrangements.
How much time will it take to travel from Ghaziabad to Jewar Airport?
The proposed corridor is expected to reduce travel time between Ghaziabad and Noida International Airport to around 40â50 minutes.
The route will also connect Greater Noida and YEIDA with the existing DelhiâMeerut Namo Bharat network at Ghaziabad.
These are estimated journey times for the proposed project, not current travel timings.
What is the current status of the YEIDA Metro project?
As of 2 November 2026, the GhaziabadâJewar corridor is at the approval stage.
NCRTC has submitted the Detailed Project Report (DPR) to the Central Government for examination. The corporation lists the project among corridors in advanced stages of approval.
The Central Government examines the project's feasibility and financial requirements before considering support. A final construction start date and completion deadline have not been confirmed.
What other Metro projects will improve Yamuna Expressway connectivity?
Apart from the GhaziabadâJewar corridor, Noida Metro Rail Corporation (NMRC) has three proposed Aqua Line extensions that can improve connectivity across Noida and Greater Noida.
Proposed Metro corridor | Length | Stations |
|---|---|---|
Sector 51 to Knowledge Park V | 17.435 km | 11 |
Botanical Garden to Sector 142 | 11.56 km | 8 |
Depot to Boraki | 2.60 km | 2 |
The Sector 51âKnowledge Park V extension will connect Noida, Greater Noida West and Greater Noida with the existing Aqua Line network. Sector 61 will provide interchange with the Delhi Metro Blue Line.
The Botanical GardenâSector 142 extension will connect the Aqua Line with the Delhi Metro Blue and Magenta lines at Botanical Garden.
The DepotâBoraki extension will connect the Metro network to the proposed Boraki Multimodal Transport Hub, which will include railway, interstate bus and local bus facilities.
NMRC lists these extensions under its upcoming projects. L&T was selected in August 2026 to construct the Botanical GardenâSector 142 and DepotâBoraki corridors.
How Will the YEIDA Metro Impact Real Estate Prices?
The proposed Metro and Namo Bharat connectivity can make the Yamuna Expressway region more attractive for homebuyers and property investors. Better public transport will improve access to residential sectors, commercial areas, Greater Noida and Jewar Airport.
According to a RealX Stats report, average residential plot prices along the Yamuna Expressway increased from âš1,650 per sq. ft. in 2020 to âš10,500 per sq. ft. in 2025. Apartment prices also increased from âš3,950 to âš10,200 per sq. ft.
The proposed stations in Sectors 15, 17, 18, 21 and 33 could further improve connectivity and support property demand in these locations.
However, this price growth cannot be linked to the Metro alone. Jewar Airport development, expressway connectivity and industrial investments have also contributed to the region's growth. Actual Metro-related price impact will depend on project approval, construction progress and the start of services.